The Maliseet Convenience & Gas Bar is currently in the process of a three phase renovation. The first phase of the renovation was changing the location of the gas pumps to just in front of the store. More pumps were also added, with an additional 2 main pumps totaling 6 main pumps, and an additional diesel pump was added, now totaling 2 diesel pumps.
The second phase of the renovation was a refurbishment of the building itself. Both the inside and outside were completely gutted and redone adding additional space on the inside of the store, and changing the layout around. More shelving and freezer space was added inside the store in order to expand the grocery capacity. This was done with the intent of having more essential grocery items available for the community, so community members can access what they need locally.
The final phase of the renovation will start sometime this summer and will see the entire parking lot re-paved including around the building to give people access to the new drive-thru. More detail on the new drive-thru will come soon, as it gets closer to opening. In the mean time, come and check out the new renovations.